Feature: The Backyard Pump Track – Construction

Return to article
Lodi pump Track

Lodi pump Track

This track was built in only one day! used 40 cubic yards of dirt. And fit into only 20’ x 30’ area. A smaller tractor was ordered in order to bring the dirt through the garage into the back yard!


NOTE: There are two ways to comment on our articles: Facebook or Wordpress. Facebook uses your real name and can be posted on your wall while Wordpress uses our login system. Feel free to use either one.

Facebook Comments:



Leave a Reply

Your email address will not be published. Required fields are marked *

*
*